27.7 C
Chennai
Saturday, October 18, 2025
HomeNewsVPK Packaging Invests in Sustainable Corrugated Growth

VPK Packaging Invests in Sustainable Corrugated Growth

Related stories

ProAmpac acquires International Paper’s bag converting operations

ProAmpac, a global leader in flexible packaging and material...

Metsä Board launches enhanced classic FBB at simpele

Metsä Board has completed an EUR 60 million modernisation...

Mondi at HOST Milano 2025: Sustainable packaging for coffee industry

Mondi, a global leader in sustainable packaging and paper,...
spot_img
VPK Packaging Belgium has taken a major step in its sustainable growth journey: a new 2.80m BHS corrugator has been successfully installed at the Erembodegem site. This investment not only represents a technological upgrade but also a clear promise to our customers: more capacity, better performance, and even stronger customer focus.

With over 90 years of experience, VPK Packaging continues to invest in the latest technologies. The new corrugator replaces the previous 2.50m machine and was installed in exactly the same location, with minimal disruption to production. Thanks to a well-thought-out plan, smart logistics, and the dedication of our employees, we were able to continue producing boxes — even during the seven-week conversion.

“This investment is not only a technical milestone but also proof of what internal collaboration can achieve.” — Tony Reunes, Operations Director Corrugated Board BE & NL Our choice for a 2.80m wide machine aligns with our ambition for our site in Erembodegem: growing from 100 to 170 million m² of corrugated board.

Our new BHS corrugator is a state-of-the-art installation that enables us to produce board with:

  • Higher quality through advanced glue temperature control
  • Less waste thanks to more efficient processes
  • Greater reliability via the integrated zero-defect system
  • Faster delivery due to increased capacity

Our employees played a crucial role in the success of this project. Their flexibility and commitment made it possible to keep production running during the conversion. Our external partners were also invaluable. Their expertise and involvement accelerated the installation and ensured a smooth start-up. Thanks to the modular setup and the flexibility of our contractors, the milestone was reached ahead of schedule.

spot_img

Latest stories